The plumber came by first thing in the morning and changed out the valve. And the drywall was taken out in the shower as well:
Mommy finished pulling up the laminate floor (Graham helped, of course):
The contractor showed up and pulled the toilet off its base and we found more wallpaper when he pulled off the cultured marble by the tub:
Here's what it looked like at the end of Day 1:
The shower base is to be installed today and hopefully tiling will begin soon after! And somehow, Graham is sleeping through all the noise (thankfully!) :-)